Vaillant Heat Pump, Chingford E4

A renovation in Chingford E4 where the survey showed a smaller Vaillant heat pump would do the job properly. So a smaller one is what went in.

  • Grant£7,500 Boiler Upgrade Scheme
  • Time on siteThree days
  • Postcode areaE4

020 3393 1331

Rated 5.0 on Google
The smaller aroTHERM plus on its feet against the house wall.

A heat pump sized to the house, not rounded up, in Chingford

We replaced an old gas boiler in Chingford E4 with a smaller-capacity Vaillant aroTHERM plus air source heat pump, sized to the home's actual heating and hot water demand, during a wider renovation. Three days on site, with the £7,500 grant taken off. Rounding a heat pump up to be safe is a common mistake. An oversized unit costs more to buy and runs less efficiently.

The heat loss survey showed the house did not need a larger unit, so a smaller one was fitted. It runs in longer, steadier cycles, which is quieter and more efficient than a big unit starting and stopping.

The unit stands on blocks against the house wall, clear of the ground, with a short pipe run inside.

Air source heat pumps

The job in short

  • Where: Chingford E4, London Borough of Waltham Forest
  • Heat pump: Vaillant aroTHERM plus, smaller capacity
  • Replaced: An old gas boiler, during a renovation
  • Grant: £7,500 Boiler Upgrade Scheme
  • Time on site: Three days

Photos from the job

Inside: the cylinder with the controller and the valves in one cupboard. The unit on its blocks, clear of the ground, with the pipe run going into the wall.

Thinking about a heat pump in Chingford?

We measure every room, calculate the heat loss, check the radiators and the space for a cylinder, and send a written price with the grant already taken off. No cost and no obligation.

Page updated